Utility metering

Utility metering, and the data behind it.

Good energy decisions need accurate meter data. Estimated reads, faulty meters and missing half-hourly data lead to wrong bills, weak budgets and carbon reports nobody trusts. We make sure your meters are the right type, properly contracted and producing data you can use.

What we do

  • Meter Operator (MOP) and Data Collector (DC) contracts – appointed, managed and kept compliant across your sites
  • Smart and AMR meter upgrades – arranged through your supplier or meter operator
  • Faulty meters and estimated reads – raised with the right party and chased until fixed
  • New sites – meters and data set up correctly from day one
  • Half-hourly data – retrieved under your letter of authority, including smart meter data through the regulated DCC route via n3rgy
  • Half-hourly data analysis – baseload, out-of-hours use and peak demand, £35 per HH meter per month

Why it matters

Your meter data feeds everything else we do. It sets the capacity you pay for, the budget we buy against and the figures in your ESOS or SECR report.

FAQs

What’s the difference between AMR and smart meters?

Both send readings automatically. AMR meters report to your supplier or data collector over the mobile network. Smart meters connect to the national smart meter network run by the DCC.<br><br>AMR vs smart meters <i class=”ph ph-arrow-right” aria-hidden=”true”></i>

Do we need half-hourly meters?

Sites using over 100 kW already need half-hourly settlement. Market-wide half-hourly settlement is moving all sites the same way.<br><br>Market-wide half-hourly settlement <i class=”ph ph-arrow-right” aria-hidden=”true”></i>

Who owns our meter data?

You do. We only access it under your letter of authority and use it to act on your behalf.

Not sure your meters are giving you the full picture?

Send us 12 months of bills and we’ll check.

Bloom accredited supplier
  • Bloom accredited supplier – public bodies can appoint us by direct award under NEPRO3.
  • Member of the Ofgem ADR scheme, membership C35THEN01.
  • Every fee in writing before you sign.