Site intelligence

Know what your sites use before you spend.

Some sites pay every day for electrical capacity they don’t use. Others plan solar panels or EV chargers without looking at their own half-hourly data first. We start with half-hourly data analysis – what your meters actually show – then tell you what’s worth doing.

Commercial energy audits, capacity reviews and half-hourly data analysis

ServiceWhat it coversPrice
kVA capacity reviewYour agreed capacity against your actual peak demand over 12 monthsFree
kVA reduction – your supplier appliesWe provide the analysis and application support£99 per site
kVA reduction – we handle it end to endAnalysis, application and liaison with your network operator£149 per site, or 25% of first-year savings capped at £350
Half-hourly data analysisBaseload, out-of-hours use, peak timing and demand-side opportunities£35 per HH meter per month
Desktop feasibilitySolar, battery, EV charging or heat pumps: system size, expected output and payback from your own data£199 per site
Commercial energy audit (on-site survey)On-site walk-through and written report with costed actions£750 to £2,000

The kVA service is standalone. You don’t need to buy procurement to use it, and on the percentage option you only pay if it saves you money.

We never recommend a capacity cut that would block your plans for solar, battery, EV charging or heat pumps.

Need better data first? We manage meter contracts and upgrades too.

Utility metering

From feasibility to installation

When a project stacks up, we pass it to our sister company zerocrbn, which handles solar and battery design, finance and installation. Our report goes with it, so nothing is lost in the handover.

FAQs

What is agreed capacity?

The maximum power, measured in kVA, your network operator has reserved for your site. You pay for it every day whether you use it or not.

Is there a risk in reducing capacity?

Yes, if it’s cut too far. Going over it brings excess capacity charges, and increasing it again later can mean an application and cost. That’s why we build in headroom and allow for future plans.

Is a desktop survey enough to go ahead with solar?

No. It tells you whether a project is worth a full site survey and design, so you don’t pay for surveys on projects that won’t pay back.

Do we need half-hourly data?

It helps. Most larger sites already have it. If yours doesn’t, we can request it under a letter of authority or work from your bills.

Are you paying for capacity you don’t use?

Capacity reviews are free.

Bloom accredited supplier
  • Bloom accredited supplier – public bodies can appoint us by direct award under NEPRO3.
  • Member of the Ofgem ADR scheme, membership C35THEN01.
  • Every fee in writing before you sign.